I have a pump that does 4750GPH and I am going to get 3/4"pvc or 1/2".
I am trying to have the PVC end over the surface to make a a lot of air bubbles in the tank.
Or should I do 3/4" pvc from the pump and change it to 1/2" once the plumbing reaches the top of the tank?
The I.D threads on the pump is probly 2-3" and I have to get diff fitting to match the 3/4"/1/2" pvc.
Which would make the most pressure???????
Right now I have it split in both ends of the tank but I want more pressure, so I am going to do it with just one end piece
Thanks
I am trying to have the PVC end over the surface to make a a lot of air bubbles in the tank.
Or should I do 3/4" pvc from the pump and change it to 1/2" once the plumbing reaches the top of the tank?
The I.D threads on the pump is probly 2-3" and I have to get diff fitting to match the 3/4"/1/2" pvc.
Which would make the most pressure???????
Right now I have it split in both ends of the tank but I want more pressure, so I am going to do it with just one end piece
Thanks