Well after several months i am finally almost done with this project.
First the stand that came with the tank was not strong enough so i had a custom one made.
then the tank had 10 holes plumbed in it?so seven holes were patched up.
then custom z lock tops were made
today the u v sterilizer and the heater modules were installed.
also the plumbing was done for the three remaining holes
The tank now holds water
tomorrow the tank will get finished up and filled on sunday


First the stand that came with the tank was not strong enough so i had a custom one made.
then the tank had 10 holes plumbed in it?so seven holes were patched up.
then custom z lock tops were made
today the u v sterilizer and the heater modules were installed.
also the plumbing was done for the three remaining holes
The tank now holds water

tomorrow the tank will get finished up and filled on sunday



that is one of the best pics i have ever seen on this forum.
Looks great!