SO back to being stuck on the filtration. Here is my current plan, please poke holes/give advice where you see fit.
Drill the back of the tank in the top right corner (the BG convers this area)
Two 1.5" bulkhead with 90 degree elbows pointed down (external durso's).
One 1' bulkhead fitting to a 90 degree elbow pointed up as an over flow that will make sure the water level never rises above a determined height.
Plumb the two 1.5" overflows into a 2" gate valve to adjust the flow and silent the overflow.
The 2" line will always be sumberged so it should be silent.
^ am am drilling this tomorrow and getting ready for the background install. I HAVE to have this tank running this week.
Drill the back of the tank in the top right corner (the BG convers this area)
Two 1.5" bulkhead with 90 degree elbows pointed down (external durso's).
One 1' bulkhead fitting to a 90 degree elbow pointed up as an over flow that will make sure the water level never rises above a determined height.
Plumb the two 1.5" overflows into a 2" gate valve to adjust the flow and silent the overflow.
The 2" line will always be sumberged so it should be silent.
^ am am drilling this tomorrow and getting ready for the background install. I HAVE to have this tank running this week.