i just need to know the gph for 1-1/4 and 1-1/2 pipe as i need to decide what size bulkheads i want to install in a 220g that i am going to have built. i would like the option to run some major turnover rates if i want. thanks.
Danh;1210853; said:I guess you don't understand??