i just built a 2x4 stand for a 100g i just got. only problem is that the box i built is not too straight. i havent covered the top yet. so just the box frame right now. what can i do to level the top surface before placing the tank on? what im saying is that when i put the tank on, one of the corner has a gap. will covering the top piece fix this problem?