I have just ordered my new 8 x 2 x 2 with low iron glass front panel and new stand and hood 
Only problem now is waiting the 10-12 weeks for completion and delivery it is going to drive me crazy. At least it will give me time to get on with the new background and get the equipment sorted for the drip system and drainage that is needed.
I am sure i will be doing a thread on the background which should be fun, just got to get the styrene and get on.

Only problem now is waiting the 10-12 weeks for completion and delivery it is going to drive me crazy. At least it will give me time to get on with the new background and get the equipment sorted for the drip system and drainage that is needed.
I am sure i will be doing a thread on the background which should be fun, just got to get the styrene and get on.


