I want use schedule 80 for the part of the return that is visible but would the fittings work with the NPT loc line fitting ?
Also do i have to plumb the return schedule 80 through out or can i use schedule 40 from the pump to bulk head and shchedule 80 from the return side of the bulk head to the loc lines ?
Figure the schedule 80 will look better than sray painting the sch 40
Also do i have to plumb the return schedule 80 through out or can i use schedule 40 from the pump to bulk head and shchedule 80 from the return side of the bulk head to the loc lines ?
Figure the schedule 80 will look better than sray painting the sch 40