today i switched out my 100g for my 150g and man what a pain in the ass!
heres the short-list of a whole days worth of work:
1.clear out dining room to make room for tub.
2.bring tub into house from shed
3.drain 100g into tub and place heaters,fish, and powerhead in tub.
4.scoop out gravel.
5.move 100g into mini-van after bringing seats into house.
6.move 150g from bedroom into living room.
7.take 100g to storage unit and unload.
8.scoop gravel back into 150g
9.start filling 150g, place fish and heaters back into 150g.
10. top off tank and place filters in tank.
11. make shure everything is working properly and clean up mess.
12.take tub back out to shed and put crap back in dining room.
13. sit down and
!
i get to do it again in like 6 months after i get my 6'x30"x24" tank built but i may hold off until we move.





heres the short-list of a whole days worth of work:
1.clear out dining room to make room for tub.
2.bring tub into house from shed
3.drain 100g into tub and place heaters,fish, and powerhead in tub.
4.scoop out gravel.
5.move 100g into mini-van after bringing seats into house.
6.move 150g from bedroom into living room.
7.take 100g to storage unit and unload.
8.scoop gravel back into 150g
9.start filling 150g, place fish and heaters back into 150g.
10. top off tank and place filters in tank.
11. make shure everything is working properly and clean up mess.
12.take tub back out to shed and put crap back in dining room.
13. sit down and
!i get to do it again in like 6 months after i get my 6'x30"x24" tank built but i may hold off until we move.




