Hi all,
Today is damn hot over here, the concrete pouling begin at 11am and finished at 1.50pm. so so hot, i guess 35C - 36C in the noon time. Today finished the concrete base for 1 side of the base for 2nd level tank. used 7 meters cube of concrete for this. will need 5-6 days before the concrete totally cure.
enjoy some sweating photo..... ;-)










Today is damn hot over here, the concrete pouling begin at 11am and finished at 1.50pm. so so hot, i guess 35C - 36C in the noon time. Today finished the concrete base for 1 side of the base for 2nd level tank. used 7 meters cube of concrete for this. will need 5-6 days before the concrete totally cure.
enjoy some sweating photo..... ;-)










, what kind of filtration system is it going to be?