Looking good so far. Now I know who to call when I want to build that custom tank for the house.
Fantastic work so far!!
epic tank.
Phixer it makes perfect sense to me and appreciate the post. I just can't see 4-6mm being right. Your talking about almost an 1/8"-1/4" glue gap? Sure you don't mean .4-.6mm?



Most folks dont consider these factors and end up with excess bubbles or creases in the joint. If the panels are not allowed to move as the cement dries you end up with creases in the joint, this is very common and looks like this (see attached photo). If the panels are too large and heavy to move on their own (i.e sheet of 2" thick material) they need to be moved closer together by hand as the cement dries.


