All points above true; Jaws not sure if you recall a recent post from me about how I drilled additional holes across my overflow wall? This was the reason . Also to add, if the overflow is able to take on more volume the other bottleneck is the primary drain. Once I did this I had to open up the primary drain via gatevalve to make sure it could keep up with the increase.