I used pictures from another build in here for an outline. I will be putting a 55g sump in the bottom. It is not yet done. I plan on cutting out holes in the back for cables. Only took me about 5-6 hours total so far.
Total cost just frame. $25.
Top, bottom and back: $30







My next challenge is a door. Might even go with a curtain.
(Not sure why some pictures came out small)







Total cost just frame. $25.
Top, bottom and back: $30







My next challenge is a door. Might even go with a curtain.
(Not sure why some pictures came out small)









