Here is another update:
All pond liners and bulkheads are in place. ponds are level and I drilled my first hole in glass tonight. I did this in the bath tub
. Drilling the hole was not to hard but not easy. I also siliconed dividers into one of the glass sumps. I will have 1/2 of the sump filled with mechanical/ scrubbies acting as a wet dry and the other with matrix and heaters. I will also have 5 foot bio towers on each sump. If your confused I will have great pictures of plumbing starting tomorrow. Here are a few pictures. Also I included a picture of the staircase that I have had to transport everything down. 14 steep stairs and a 30 inch door.







All pond liners and bulkheads are in place. ponds are level and I drilled my first hole in glass tonight. I did this in the bath tub












