KABB44423;1153601; said:did u make sure ur scrubers were all plastic and not the ones with copper in it
necrocanis;1154933; said:I ordered about 200 potscrubbers a while back from some website. Costed me like $35 and free shipping. Not sure of the site. I will look it up. Filled up 2 five gal buckets, and a 10 gal tote.
soggysandwich;1153399; said:here are some pics, there is tap on the over flow to hold down the check valve while the silicon is drying. and yes i know i have to cut the hose, im going to look for a check valve for that to so in case of a power failage the water doesnt start to siphon down the out take tube emptying my whole tank
CHOMPERS;1155152; said:![]()
You will find that you will need to extend the vent tube higher than the top loop. Other than that, you did a nice job.
when its donenycsicktank;1156214; said:lets see the whole set up!![]()
yeah that would be helpful.AiR foRc3 wUnZ;1156797; said:Necro did you ever find the sight?