Egon you are my hero! Hopefully I will get some time tommorow to start working on this. By the way the tank is already fitted with bulkeads, 1", but they aren't threaded so I won't be able to screw in a strainer into them. The other thing is that on the underside of the bulkheads they have a slip PVC glued in them with a um not sure what it's called but you know the end so you can add flex/vinyl hose to it and tie it off with a clamp. Will I be able to run some flex hose off of that then transition to PVC to make the overflow portion?
Do you happen to have a picture of your plumbing that you could post so I could visualize this project a little easier. I'm just a tad confused when you said I should run all the pipes indiviually up and then connect them at the tee. I can't picture what you are meaning. I'm thinking that I will have 5 seperate pipes running up the back of my tank with 5 seperate tees for each pipe then when I throw the 90 on up there by the tee to come back down to the sump I will sort of connect them all at that point to a larger 3" pipe to finally end up in the sump? If I am completely wrong please help me out. Thanks.
Do you happen to have a picture of your plumbing that you could post so I could visualize this project a little easier. I'm just a tad confused when you said I should run all the pipes indiviually up and then connect them at the tee. I can't picture what you are meaning. I'm thinking that I will have 5 seperate pipes running up the back of my tank with 5 seperate tees for each pipe then when I throw the 90 on up there by the tee to come back down to the sump I will sort of connect them all at that point to a larger 3" pipe to finally end up in the sump? If I am completely wrong please help me out. Thanks.
