Dedicated PC (or a PLC with HMI), high and low level indicators, pvc pipe, 110 volt valve actuators, pump, water line taps, in line thermometer with output, heater control with input, reservoir for Prime...it's all there, but it would be a fairly major undertaking to get it done.