So since you are reinforcing the floor, you have a basement? A 750 gallon on the second floor would scare me to death on the second floor but you know what you are doing. btw nice crib it looks great
michael;3013465; said:thanks. Its a crawl space with a 4 foot ceiling. Having 4 foot deep holes dug and using sonic tubes and filling them with concrete. then reinforcing the acual floor and adding columns/joists for support. Also having a underground drain area done for the central constant drip system. Will drain to a gravel pit below the freezing point of the ground next to the house. it is going to be some project
michael;3013019; said:For now my larger pbass, cats, rays, etc will go in