The Cement Truck with 5 Cubic Meters of PreMix Concrete and a 20 Ton Crane have arrived. The topping up for the RC Roof Slab should be completed soon. More Pics of the activities in the evening.
Only Temporary . The Arm is longer than the house ..... eeeek..
Here are some further update on the RC Slab Roofing over the Fish Room.
This was done with the help of a large crane with the cement mixer truck
to supply the ready mix concrete.
More progress pics of the RC Slab Roof Cement Pouring.
This set of pics shows how the hopper from the crane is loaded by the cement truck. The Cement Load is then lifted and moved to the roof section
where the workers are ready for the unloading.
On the Roof Section The Load of Cement is unloaded from the Hopper on to the RC Jigs. The Mix is spread around with the help of a petrol driven vibration compactor. The surface is then leveled with the Workers cement stick.
Looking at this close angle you can see the size of the hopper and it takes quite a few heavy hands to release the cement mix over the Jigs.
Progress is quick using the crane and the workers said that it will be completed within the day. Already reaching the half way point. They will be a break while the cement truck goes for another fresh load of ready mix. At this point it is approximately mid-day. You can see the shadows sharply defined.
These are the final pics of the RC Slab Roof Work activities. The roof will be finished off with a fine cement coating. Sorry missed that part of the afternoon. Will post the finished rc slab roof section when the cement stuff cured. till then cheers.