The investigator said it was the power strip controlling the LED lights but that makes no sense, a fuse would have shut that down it was not a cheap power strip, also it was at 3 am in the morning, lights were off. I don't think I will ever know....
The build slowed down after the frame was up or maybe we were just impatient, the inspection of the electrical, ac and plumbing took awhile.
My two outside dogs survived the fire, after 8 months being boarded, they are finally home (since the water and outside fence was built we wanted to move them in to get adjusted plus we missed them alot)
Fire Hydrant almost done, city required this since we are 900 feet away from the main street, don't ask me how much this cost... ugh
Stone, was a mixture of 45% Oklahoma, 45% millcreek and 10% ripple (cool reddish rippled ston
Brick arrived shortly after, it's old time brick from Hanson brick called Cajun French
Drywall almost done, should be painted white by this Sunday
Tile is here, 2800 square feet's worth
They are mason's are starting on the stone and brick today, they said it should be 7 days until completion, here is how it's looking so far
Thanks again for everyone's support and concern, we see a light at the end of the tunnel finally, we can't wait to get out of the apartment.