I also discovered that I have to tear up a good chunk of the floor and part of the wall. Under the tile (where the old brick chimney originally stood) I was surprised to find a 8" thick slab of concrete. Luckily, I did concrete work for several years and i will able to tear it out rather quickly.
After tearing up the tile, I went to the pet store and bought a 25 pound bag of natural medium gravel that I'm going to mix with the sand. I'm buying another 25 pound bag of fine gravel as well; I want a natural look to the tank.


After tearing up the tile, I went to the pet store and bought a 25 pound bag of natural medium gravel that I'm going to mix with the sand. I'm buying another 25 pound bag of fine gravel as well; I want a natural look to the tank.




BTW- You need to get some new pics of the jags up. I haven't seen them since you took them!