ok
built the stand/bracing
did the overflows and plumbing
still have to do
the returns
100 slits in the overflows
glue pipe
this and that lol
"and i put the overflows kind of low cus im not sure how high the waterline will be"
heres how the returns will be.
going to do the "loop"
and at each tupp a T
was going to put them on the other end but when i spin it around there will be no hoses/pipes.
glued the pvc,drilled holes in the overflows "was easier then cutting thanks chomps",did the returns.
its up and running,and no leaks that i see.
needs a bigger pump but it works for now.
going to let it run overnight,then gotta drain it,spin it around,then refill and add media.