Nic Peacock Bass MFK Member Oct 8, 2005 15,800 14 119 outside philly Jun 24, 2008 #11 calculator would only be a guestimate as all sands are a lil different..........
K koop171 Fire Eel MFK Member Feb 1, 2008 3,623 8 68 40 ohio Jun 24, 2008 #12 I just got done putting my sand in my 125 this past weekend and it took about 100bls to cover the bottom deep enough that the sand was about a 1/4" above the trim.
I just got done putting my sand in my 125 this past weekend and it took about 100bls to cover the bottom deep enough that the sand was about a 1/4" above the trim.