The brace is still curing. It gets re-filled today. Both sumps are re-sealed, new holes drilled.
Plumbing is 90% re-done It turns out I need a 1 1/4" barbed 90* to finish it.
Plumbing is 90% re-done It turns out I need a 1 1/4" barbed 90* to finish it.





