More boxes in the mail! new pump, bio pellet reactor & carbon reactor. Also picked up 150lbs of crushed shells from Boca Grande. The shell substrate is currently being cleaned out, then dried out before going into the tank.
Also sealed all seams and caulked the gaps, then painted the entire inside of the stand with a "BLACK JACK 3.6-Quart Elastomeric Roof Coating" in white. The paint is a siliconized paint designed to make metal and wood all weather.