Building a 310G tank with bulkhead that will overflow into a sump/wetdry. I want to put the bulheads that feed the sump about 1/3 of the way down the back wall of the tank. Will this design feed the sump when water is returned to the tank and keep the tank at a constant level as well. I know I will need a hole in the top of the arc to prevent a siphon, just forgot to draw it in. Is there a better way to accomplish this?


