I been toying around with this overflow for a while now...
I have .75" bulkhead fittings on the upper 1/3 of the back wall on the tank.
I have a .75" MPT to 1" slip adapter,
that is passing through the wall of a 12" long x 3" ABS pipe
then there is a 90 degree "L" and then a 1" scd 20 PVC pipe reaching down to 1" from the bottom...
Not showing is the 3" cap for the bottom of the overflow
and the slots cut into the top of the 3" ABS pipe...
Please leave your thoughts and comments...
Will it work, why not, let's talk about it...




I have .75" bulkhead fittings on the upper 1/3 of the back wall on the tank.
I have a .75" MPT to 1" slip adapter,
that is passing through the wall of a 12" long x 3" ABS pipe
then there is a 90 degree "L" and then a 1" scd 20 PVC pipe reaching down to 1" from the bottom...
Not showing is the 3" cap for the bottom of the overflow
and the slots cut into the top of the 3" ABS pipe...
Please leave your thoughts and comments...
Will it work, why not, let's talk about it...



