Ha, quite some done today.
The bottom-drain part is all finished and ok.
There's now water covering both drains and liner is pretty much straight in, nothing I want to get better than that.
2nd Settling Tank leaks like a sieve though, waiting for the last bit of water to stop draining and then see what the problem is/where it stops.
Sides and back wall are pretty much where I want them. Just waiting for more water, but want to have the dome for the 2nd drain finished and connected so I can just keep filling after that.
Looks great, huge with the white liner. Very happy with it.
Cheers,
Luc
The bottom-drain part is all finished and ok.
There's now water covering both drains and liner is pretty much straight in, nothing I want to get better than that.
2nd Settling Tank leaks like a sieve though, waiting for the last bit of water to stop draining and then see what the problem is/where it stops.
Sides and back wall are pretty much where I want them. Just waiting for more water, but want to have the dome for the 2nd drain finished and connected so I can just keep filling after that.
Looks great, huge with the white liner. Very happy with it.
Cheers,
Luc