So I wanted a pond sense my 300g plywood build is on hold. So I went and bought a 8'x8'x18" pool with a 20mill PVC bottom, I started digging and im going to put down 1/2" felt underneath and that will also help keep warm on the 8 days a year it gets cold here. the area i put it in is in direct sunlight till about 2pm so im not to terribly worried about temp. although it will be monitored and covered if needed. so im sure i will get a ton of negative remarks for this as i do for everything else but its all good
PS i love digging in florida, this took me all of 2 hours with a lot of beer breaks http://i42.photobucket.com/albums/e304/AndrewMack/DSCF6335.jpg
almost done
PS i love digging in florida, this took me all of 2 hours with a lot of beer breaks http://i42.photobucket.com/albums/e304/AndrewMack/DSCF6335.jpg
almost done
