Getting ready to cast the base for my pond, but don't want to concrete the pipe work and bottom drain in. I would rather surface run them. Is there any reason why this cannot be done, it does not bother me being able to see pipework. My plan is to run the pipe to the lowest part of the pond, or form a small area lower than the rest of the base.