kumdoalan;1778690; said:Is everything going as planned?
So far so good except for the (Fishroom Wall) filter wall which is supposed to be all the way to the bottom of the pond base. The intention is to separate the filter section from the main indoor pond area. This area will be joined by a bottom drain pipe connection. Return water will be from a Bakki Shower DIY at the other end through two 2" pipe. (more or bigger can be put in as needed even after the pond is completed)
Have spoken to the contractor and he say that it will be bricked up later as they wanted to make the filter and pond base as a single concrete casting to ensure a leak free base.
Will have to test the pond the next few days and see whether any seepages / leaks happens.