Here's some views of the preparation and before pictures.
Cleaning, washing was done and the pond was left to dry for a few days before the Filter Sections were glued up using silicon glue and plate glass which was cut to size by the supplier.
1. Indoor Pond final washing and draining to be done. Notice the fine layer of Cement powder on the pond floor.
2. Filter section being washed and cleaned and then left to dry out for a few days.
3. The pumps, filter media, Silicon Glue, Air pump that will be used in the filter.
4. Plate Glass which have been cut to fit the wall of the Filter Section. Cleaned and Ready for the Silicon glue.
5. Silicon Glue, Applicator, Cloth, Razor Sharp Knife and Large Tissue Roll to clean up the glass before glue application.