Dr Joe;2724528; said:You need to dechlor the water first, now if you inject dechlor at the faucet end with a metering pump and create a mixing turbulence...
.
Piece of larger screen over the opening?I'll try to post a video. I get a little nervous when I have to prime it because I have some clown loaches (3"-4") that could get sucked up if they're in the wrong place at the wrong time. They typically hide when I'm doing water changes, but I still worry about it.
Old thread coming back to life!
aldiaz33 i’m in the market for a new python on roids as you say. Looking back at this, does the valve placement seem like the right spot or would you have moved it closer or farther from the vacuum tube?
I’m going to be building one soon...spending waaay too much BUT it will look awesome on YouTube lol.
Ps: this thread convinced me to up my tubing to 1.25”, I had planned for 1” orginally. Going to use 3’ long piece of 2” clear pvc for mine.