Bottom trey is in the sump. 2nd coat of paint is on. Tommorrow Ill finish the ceiling and do the 3rd coat, tile the floor, Drill for the bulkheads and hopefully get the stone covering on the pond wall.
Big snow storm made my 60mile trip to lowes go a little longer than I had planned. Ended up getting the stone wall covering up, ceiling done, trim stained and walls done. Hopefully tommorow I can actually start on the actual pond.
Heres the pond wall. There will be trim both on the top bottom and sides. Should look pretty good when finished.
The trim that I finished up...still got quite a bit to do
Tile that will be on the outside of the floor
And the tile that will be inside the pond. Should look kinda like sand under 3ft of water...better than a black bottom.
Wow! Your build is looking amazing! Where in Iowa are you at? I am in Omaha. I would offer to come help you for a day, but at the rate you're going, you would be done before I got there!