I had the same thought just a min ago and was coming back to add that. I will plan the sump for two of those and add the other one as/when needed. Awesome for another part of the plan coming together. Now to work on a return pump or two if need be. Damn the electric bill will be going up for sure even with shutting down a couple other tanks I bet.