A few little adjustments on the framing then I'll be able to glue to the bottoms on the 24" tanks then silicone the glass in place. I plan to mask the glass and overlap it with Pond Coat 3/4" for a solid seal. I'll double check the adjustments on Saturday then do all four tanks at once.
Bringing in the other two pieces of glass for the 19" tanks to clean them tomorrow night and hopefully get to fit test them.
Bringing in the other two pieces of glass for the 19" tanks to clean them tomorrow night and hopefully get to fit test them.