Top View of the Roof Jig.
Pic 1 Shows one of the RC Box Beam in place in the channel provided by the workers. The other RC Box one is still on the ground waiting to be put into place.
Pic 2 Show the Boards all shored up and nailed in place. The Original wall have been hacked to expose the RC Bars which will be used to linked up to the new RC roof. The piece of wood is the 4" by 2" which are used for the structure below the boards.
Sorry missed the actual construction of this particular part.
More updates later when progress is made.