yeah even with the mixer it's hard, without the mixer I doubt I could do more than 6 bags in a day. (I'm a slow hand mixer lol)
but my little fiasco took more of a toll than I thought, the pond stopped drainign at 18" so a little higher than i thought but the wall that I hadn't finished moirtaring eroded and now I have chicken wire that's 9" from where the mud is and the bottom is filled with water and mud, which of course is alot harder to pump out. lol
so now I have to dig out the bottom again to get to the mortar, then re tack the chkien wire in its new position and then mortar that side.
once that's done I cna do the top coat which will use less mortar per square foot but take more time as it has to be smooth.