Thank you. I’ll have to do that. Found a small leak at the Union for the reeflo pump. I’ll need to add more putty.
If I close all by ball valves, I can fix these leaks without draining the tank right?
I would recommend getting a lot of unions and union ball valves.Good stuff! I just a bunch of my pvc and need to start planning. Hopefully will have the tank up and running in 2-3 weeks. As a first timer, any lessons learned? I’m nervous about the plumbing.
Perfect. Thank you! I’ll do that tonight!Yep! That’s why you spent the big bucks on the union ball valves. Remember I did the same in the last build.
I’m afraid that’s already been busted open and consumed!Getting close... Gonna have to break that blue label out soon.
