Tore out the heat, UV and manifold. One of those “hold my beer” moments I guess.

Cleaned up the cables, the underside (auxiliary/utility) power supply/light is centered and cables mounted. The UV was moved to the underside of the stand as well.

The main power supplies are two isobar tripplite x6 units. Those are stored in covered boxes in the center of the stand. The UV will be mounted on the under side of the stand with a valve to split the flow to either tank but hidden.

This is absolutely the final configuration. More real estate = less back pain. Everything tests good, is easily accessible and is ready to cycle.

Cleaned up the cables, the underside (auxiliary/utility) power supply/light is centered and cables mounted. The UV was moved to the underside of the stand as well.

The main power supplies are two isobar tripplite x6 units. Those are stored in covered boxes in the center of the stand. The UV will be mounted on the under side of the stand with a valve to split the flow to either tank but hidden.

This is absolutely the final configuration. More real estate = less back pain. Everything tests good, is easily accessible and is ready to cycle.