Progress pics
A little progress.
My plumber was redoing a couple of my mistakes. I added a separate shut of valve for incoming water for the DRIP. Changed out some threaded connections. Unfortunately the last connection leaked so I will either try to replace the o-ring or we have to change it again. Two steps forward, one step back. As soon as this is done I will change 27,9% water per day which will be sufficient. I don't power feed and I change around the same amount manually every two days now, which I'm getting quite tired of.
In all my joy last time I wrote I forgot the tank was not in final position so I had to bring in the moving company one last time to move it just about 1 foot closer to the wall. It did slip quite easy but still it's over 1000 pounds empty.
I started with the plumbing to set up a bean animal drain. I have never had an overflow before so this is quite daunting. Anyways the numbers are as following
Primary siphon to water level in overflow: 6"
Emergency pipe: 1,25" below overflow box
Open channel: 1,5" below weir height
Do I need to add dual 90s to the primary or could I just leave it straight?
Please note all pipes are dry fitted and not necessarily sanded.