• We are currently upgrading MFK. thanks! -neo
Slight delay. Still have the side pannels to put up, and a few foreground potters to put in. So much easier to paint on the counter. This dried in the sun all day, will epoxy tonightIMG_2942.JPGIMG_2943.JPG
 
IMG_2926.JPG Worked ob several other things while the paint dried. Plexiglass back splash for the sand fall. I learned the hard way on my last sand fall.
 
IMG_2924.JPG Electrical. Manual timer prior to the power strip for the lights. I like the ease of use of the manual timers so I wired one in. Lighting times are 6 to 8 am and 5 to 9 pm.
 
IMG_2946.JPG Upper canopy. To the right, pre timed to 9 outlets. Will power all lights top and bottom. To the right nine outlets on 12/3 wire. Will power heaters, air pumps, uv filter. With the exeption of lights, the bottom has two wall outlets of its own. All will be hidden by a 4.5" riser. Still needs to be pushed back.
 
MonsterFishKeepers.com